首页 news 公司概况 设备设施 修船业绩 服务网络 业务联系 招聘信息 协同办公
News Content
Hydro-blasting by Robot Success Performance
  After UHP robot hydro-jetting derusting, “CMA CGM PELLEAS”had departure smoothly after 16 days repairing. She is the first vessel with UHP robot hydro-jetting derusting as normal repairing, excluding cruise vessels and offshore production.   To ensure the success, shipyard arranged several sets of UHP robots, and 8000m2 hull plate had been derusted as owner’s request after 4 days. The bilge water from the derusting had been stored in designated receipt tank for treatment, to reach the discharge standard.
[2018-10-25 0:00:00 by HRDD]
Home | News | About us | Facilities | References | Partners | Conect us | Join us | Cooperative