首页 news 公司概况 设备设施 修船业绩 服务网络 业务联系 招聘信息 协同办公
News Content
"Sleeping Beauty" awakens - "FPSO HELANG" Conversion Completed and Delivered

On December 14, M/V "FPSO HELANG "Delivered to shipowner successfully, it lasted nine and a half months and was a perfect finish .

The conversion of M/V FPSO HELANG is the second modification project in cooperation with YINSON company after M/V YINSON GENESIS’s delivery on 2016. During the conversion period ,HRDD completed thousands tons of steel structure, nearly 30 thousands square meters of coating, about thousands meters of piping system renovation, cable laying ; helicopter platform, flare tower, installation of E – HOUSE’S modules, modification of the moon pool, ship equipment renovation and other projects. HRDD sets up project group, VO group, logistics group, MC group etc to improve management efficiency. In response to the requirements of the state, robotic hydraulic derusting and ultra-high pressure hydraulic derusting have been carried out in all open areas such as the hull, outer surface of superstructure and deck surface, During the construction period of about 300 days, the construction groups of both sides fully understood and overcame the difficulties in the spirit of long-term friendly cooperation, and finally ended up with an outstanding performance of 2.5 million man-hours without safety accidents It is understood that the ship was a "sleeping beauty"and suspension of navigation in Malaysia for many years with poor condition. But after conversion in HRDD, it can serve another 20 years without docking. The smooth delivery of "FPSO HELANG" fully proves that our company has the capability of high-end ship repair and conversion project, and will further deepen the company‘s brand in the Marine engineering market.

[2018-12-19 0:00:00 by HRDD]
Home | News | About us | Facilities | References | Partners | Conect us | Join us | Cooperative