首页 news 公司概况 设备设施 修船业绩 服务网络 业务联系 招聘信息 协同办公
News Content
The Newly Built - Floating Dock(VB0013A) Undocked Smoothly

On 11:40 am of Dec 23, 2018, the floating dock of 22000 tons lifting capacity which was built by HRDD for Cuba undocked smoothly.

The Cuba Ambassador Mr. Ramirez and his wife Mrs. Alvarez, Consul General of Cuba in Shanghai Mr. Torres, Chairman of Gemar Cuba Mr. Garcia, MD of CDC shipyard Mr. Milian, GM of General Engineering Dept. of CMC Mr. Yuan Yi Ping and MD OF HRDD Mr. Wu Ji Feng do cutting ribbon together for the floating dock launching.

The floating dock, a China government assistance project to Cuba, is the new model of the friendship between China and Cuba, also the concrete reflection of “Three Constancy” proposed by General Secretary Xi Jin Ping during he visited Cuba in 2014.

HRDD highlight all the key points of the project, ensures the quality, safety and time, completeness at undocking time reached at the highest level.

CDC site team, LR Class, CMC site team, Secretary of the party committee of HRDD Mr. Xu Wei Guo, Executive Director Mr, Liu Zhi Yong, Production Director Zhang Jian, Commercial Director Liu Wei Guo, Technical Director Mr. Chen Jie and other relevant leaders also attended the ceremony.

[2018-12-4 0:00:00 by HRDD]
Home | News | About us | Facilities | References | Partners | Conect us | Join us | Cooperative